Reinforced soil earth Wall (RE/RS wall) uses and its specifications

 This article includes :-

1- What is Reinforced soil earth Wall (RE/RS wall)?
2- why and where is used Reinforced soil earth Wall(RS/RE wall) ? 
3- What are the types of RS/RE wall?
4 - Material used in RS/RE Wall. 
5 - What is the Construction procedure of RS/RE Wall? 
6 - What are the tolerance limits for various items(like panels,joints, levelling pad top etc.) of RS/RE Wall? 
7 - Measurement Of RS/RE Wall.

1- What is RS/RE wall (Reinforced soil earth wall) ?


RS/RE Wall (Reinforced soil earth wall) is a self stabilized and rigid structure that is designed or used to restrain the soil deformation and achieve the desired soil slope.
The stability of RS/RE wall is maintained by its own weight.
The friction between reinforcement (metallic elements or polymeric elements) and soil keeps the structure in its position. Due to this friction force ,less lateral force exerts on precast panel members of RS/RE wall. 



2- why and where is used Reinforced soil earth Wall? 


RE/RS Wall (Reinforced soil earth wall) is constructed because it resist the lateral pressure of soil. RE wall also prevents soil from erosion and collapsing or slipping.


RE Walls (Reinforced soil earth wall) are used where soil has to be bounded at two different elevations.RE wall is also constructed in road construction locations where proper space is not available to maintain the soil slope.


3- What are the types of RS/RE wall? 
It was seen that any of below three types RS/RE wall is used.
(I) Reinforced soil earth wall with modular facia
(II) Reinforced soil earth wall with Gabion facia with integrated tail
(III) Reinforced soil earth wall with concrete panel facia.


4 - Material used in RS/RE Wall. 


A- Wooden wedge


Wooden Wedge are used in construction of reinforced soil earth wall to maintain batter (a receding upward slope of the outer face of a wall or other structure) of panels. These are also used to match the facial of panels. 

As per practical consideration, 4 to 6 numbers of wooden wedge are required per vertical joint for the length of structure during construction.






B- Shoulder clamp or H type clamp


Shoulder clamps are used to hold the panels in required position during erection of RE/RS wall. 


C- EPDM Rubber Pad


The full form of EPDM is Ethylene Propylene Diene Monomer. EPDM rubber pad has very good properties in cold and hot region i.e weather, ozone & water resistance at wide range of service temperature (-50°C to 140°C) with good resilience proprties at low and high temperature, excellent heat ageing properties and acid resistance properties.


Some basic properties of EPDM rubber pads are being given below. 


General Shape: Rectangular
Thickness: 20mm, 22mm
Size: 150 x 70 x 22mm
Color: Black
Hardness: 80 +/- 5 Shore A
Density: 1.19 +/- 0.03 g/cm3
Tensile Strength: Min 12 MPa
Elongation at Break: Min 200%
Change in Tensile Strength: 25%
Change in Elongation: 25%
Tear Strength: 38 daN/cm
Ash Content: Max 5%


EPDM rubber pads are used between RE panels to provide better stability and bonding. 






D- reinforcement


There are various types of reinforcements which are used in reinforced soil earth walls .
1 - Metallic elements like bars, strips, plates etc. ( Metallic reinforcement in form of mesh)
2 - Polymeric elements like strips, grids, rods, mesh etc. 

Reinforcement used to resist lateral loads can be metallic or polymeric. Metallic reinforcement should be inextensible and polymeric reinforcement should be extensible. Strength of polymeric reinforcement is largely affected by temperature and time (creep) because Polymers are visco-elastic materials.


Tensile strength of reinforcement is evaluated by conducting a wide width tensile test ( as per ISO 10319 or ASTM D 6637or EN 10223-3 for woven steel wire mesh).


All types of Reinforcements are taken beyond the Rankine zone into the resistant zone to ensure sufficient bond and anchorage.


Creep should be estimated keeping in mind the ambient temperature which in many parts of the country exceeds 40°C during summer, though in-situ temperatures may not exceed 30° - 35°C. The designer shall provide partial safety factors for creep, for 20°, 30° and 40°C degrees. These results should also include creep rupture and creep strain at these temperatures.


Partial Safety factor used in design should correspond to the temperature calculated by the procedure given in EN/ISO 20432. The design temperature should be taken as half way between the average yearly air temperature and normal daily temperature (shade temperature) for the hottest month at the site. The shade air temperature in a zone cab be obtained from IRC-6.


Polymeric reinforcement shall have minimum of 10000 hours creep test data or SIM test data at different temperatures to evaluate partial material factor for creep. Manufacturing of reinforcement should confirm to ISO 9001 standard.


Metallic reinforcement exhibits relatively negligible creep. 









* Lifting equipment(Shikanja) is used to lift and fix the panels at required locations 




E - Geo composite 
Geocomposite is a combination of geotextile and geogrid; or geogrid and gromembrane; or geotextile, geogrid, and geomembrane; or any one of these three materials with another material (e.g. deformed plastic sheets, steel cables, or steel anchors). 














F - Geotextile
Non woven Geotextiles are permeable so allow water to pass through.
When non woven geotextile is used in association with soil, it has the ability to filter /separate soil stabilization. 
The Minimum width of geotextile strip to cover gaps between panels is 100 mm. 






5 - What is the Construction procedure of RS/RE Wall? 


The responsibility of the construction of a RS/RE Wall will completely depends on the main contractor. 


Construction steps of RE/RS are being described below -
A- To achieve design parameters Foundation treatments are done if required.B- Layout of RS/RE wall structure is done on ground as per drawing.
C - Excavation of soil is done and the soil is compacted up-to required dimensions with 95% (Dry density) compaction of Modified Proctor Density.
D - An initial levelling pad of 150 mm thick using M15 (Min. concrete grade) plain cement concrete having required width to be placed below the first row of fascia layer.








E - The first layer of blocks/panels is fixed on the levelling pad with proper offset as per drawing. 
F - Make proper alignment of panels/blocks (The alignment of the block/panels/facing element must be checked regularly to make sure,the wall is straight or curve as per drawing)
G - Drainage material(as per required thickness) shall be placed at the back facing block/panel and in the hollows of facing block. The drainage material shall be compacted with vibratory plate compactor and within the block cavities. No heavy compaction equipment should be allowed to operate within 1.5 m of the back of face panel.
H - Placing the reinforced soil backfill behind the drainage zone and compacting to a minimum of 95 percent Modified Proctor density/80 percent Relative Density. 
The backfill should be placed and compacted in layers(The compacted thickness of each layer shall not exceed 200 mm.).
At no stage of construction the compaction or any other equipment shall be allowed to operate directly on the reinforcement.
I -When in direct contact, the backfill material and the drainage material shall be separated using permeable non-woven geotextile.
J - The successive face element shall be placed as per required line and level. In several cases outward movement has been observed due to poor connection of reinforcement with face element. The same procedure shall be repeated until the final layer of reinforcement is reached.
K - Before placing the drainage material and backfill, the reinforcement should be cut up to required length and placed on top of the face block. 
The reinforcement should be stretched to ensure that there are no wrinkles and the reinforcement is taut.
L - proper care should be taken that geogrid is slightly away from the external junction of outside face of fascia block. 
This will ensure that the geogrid does not protrude out of the wall and is prevented from UV ray exposure.
M - Second layer of facia block is laid over the geogrid, so that geogrid is completely interlocked between the blocks. The above procedure is repeated for subsequent geogrid layers. 
N - Where panels are used, the reinforcement should be connected to connector embedded in the panel.
O - When panels are used it is desirable to keep an initial inward better ( A receding upward Slope of the outer face of a wall) as given in the drawing.
P - Where the retained fill is borrowed and is different from the reinforced fill the construction should progress simultaneously. It is desirable that face of the blocks be profiled to have an inward batter of 2-4 degrees. 


6 - What are the tolerance limits for various items(like panels,joints, levelling pad top etc.) of RS/RE Wall? 


The construction tolerances shall be as per the following -


(A) Casting of pre-cast RCC panels: All elements shall be manufactured within the following tolerances: 



All dimensions within ± 5 mm 
Evenness of the front face: ± 5 mm over 1500 mm 
Difference between lengths of two diagonals: 5 mm maximum 
Thickness: + 5 mm (-) 0 mm 

(B) Tolerances for Faces of Retaining Walls 




(C) Dimensional Tolerances for Modular Blocks


Dimensions of modular concrete blocks shall not differ more than ± 2.5 mm for length and width and ± 1.5 mm in height.


(D) Minimum Vertical Movement Capacities of Facing Systems 






Crash Barrier : Horizontal impact load of 29 kN/m shall be considered in the design of crash barrier, which load shall be resisted by the upper two layers of the reinforcement over the full length. 


Where the height of reinforced soil wall exceeds 10 m, the designer may consider providing a berm. The minimum width of such berm shall be 1.5 m. 


7 - Measurement Of RS/RE Wall. 


(a) Reinforced Soil Wall 
Tie measurement for payment for reinforced soil wall shall be in square metres of finished work of each face and shall be measured in the plane of final inclination specified in the drawings. The measurement of length shall be the finished work along the length of the road. The measurement of height along the slope shall be done from the top level of the footing on witch the facia element is placed to the top of the capping beam. 


Measurement for friction slab and crash barrier shall be in linear metres (Running metres) and separately.




(b) Reinforced Soil Slope 


The measurement for payment for reinforced soil slope shall be in square metres of finished work of each face and shall be measured in the plane of final inclination specified in the drawings. The measurement of length shall be the finished work along the length of the road. The measurement of height along the slope shall be done from the top of the leveling pad, where provided, to the top of the embankment. Where leveling pad is not provided, the height shall be measured, in the final plane of inclination specified in the drawings, from the bottom of the slope face. 


(c) RATES 


The rate shall include cost of material, labour, plant, royalties, handling, storage and transportation expenses, cost of bed block, leveling pad, facia elements, capping beam, connectors, reinforcing elements, scaffolding, supply of the specified filter media material, supply of soil fill for the reinforced as well as unreinforced zone of the quality specified in the contract, placing, spreading and compaction through mechanical means. 


The rate shall include full compensation for design, drawings and testing of materials. 
The rate shall include the cost of investigations, design and construction of ground improvement measures. 


Most important points about Reinforced soil earth wall (RS/RE Wall)


• Minimum thickness of RS/RE wall panels is 180 mm. (including facia textures, logos and embellishments)
•Minimum Concrete grade of RS/RE panels is M 35.
• Minimum width of geotextile strip to cover gaps between panels is 100 mm. 
•Height of point of impact at crash barriers above top of pavement is 800 mm. 
•Maximum spacing of reinforcing elements shall not exceed 800 mm for RS/RE wall using panels and blocks. 
•Minimum thickness of strip footing ( levelling pad PCC) is 150 mm. 
•Minimum width of strip footing ( levelling pad PCC) is 350 mm. 
•Minimum concrete grade for levelling pad PCC( strip footing) is M 15.
•Minimum depth of embedment below finished ground level at the foot of wall is 1000 mm. 
•Maximum compacted soil thickness of each layer is 200 mm. 

•Various types of reinforcements used in RS/RE wall
1 - Metallic elements like bars, strips, plates etc. 
2 - Metallic reinforcement in form of mesh
3 - Polymeric elements like strips, grids, rods mesh etc. 
Minimum length of reinforcement shall be 0.7 H to 3 met. Whichever is greater.
Where H is design height (depth of embedment plus height above ground level) of the RS/RE wall. 


Thank you 
Mukesh Kumar 

Comments

Post a Comment

Popular posts from this blog

Granular Sub base (GSB) specifications, GSB Grading, layer thickness, Water absorption, Physical requirements (like liquid limit, Plasticity index ,AIV), construction procedure or Rolling , measurement and treatment of GSB as per MORTH 5th revision and Indian standard in Civil engineering

Granular sub-base (GSB) SUB BASE (GSB)– The full form of GSB is granular sub base.it is being laid in road work because it plays two major roles 1- it works as  drainage layer 2- it provides a good sub base to laid base layer on it. How to calculate the quantity, compaction factor value and loose thickness of GSB? To know more information kindly visit on below link 🔗  Granular sub-base(GSB) Quantity,compaction factor and loose thickness Material –     The material to be used for the work shall be natural sand, crushed   gravel, crushed stone, crushed slag, or combination thereof depending upon the grading required use of material like brick metal, kankar and crushed concrete shall be permitted in the lower sub base. The material shall be free from organic or other deleterious constituents. Grading III and IV shall be used in lower sub base. Grading V and VI shall be used as sub-base-cum-drainage layer. Where the sub-base is laid in two layers as upper sub-base an

WMM(Wet Mix Macadam) quantity / Compaction Factor value for WMM / Loose thickness of WMM Layer

Wet Mix Macadam (WMM) quantity / Compaction Factor value for WMM / Loose thickness of WMM Layer  In this article we shall discuss three important points about wet Mix Macadam (WMM) 1- How can we calculate the required WMM  quantity?  2 -  What is value of compaction factor for WMM? 3- How much loose thickness should be taken to get proper compacted layer thickness ?  1- How can we calculate the required WMM quantity? Let us consider Length of WMM Bed(L) = 1 Km = 1000 Met. Breadth of WMM Bed(B)= 7 Met. Thickness of WMM Layer (T)  = 150 mm =0.150 Met. Max. Dry Density (MDD) =2.230 Gram/ Cubic Centimeter = 2230KG/ Cubic metre Note -  The value of MDD is calculated by conducting proctor density test as per IS 2720 (part -28) : 1983 (Reaffirmed - May 2015). Then Volume of WMM Layer = ( Length of WMM Bed X Width of WMM Bed X Thickness of WMM Layer) Volume of WMM Layer = L X B X T  Volume of WMM Layer   = 1000 X 7 X 0.150  Volume of WMM Layer    = 1050 C

Granular Sub-base Base (GSB) quantity / Compaction Factor value and / Loose thickness of GSB Layer

In this article we shall discuss three important points about granular sub base  (GSB) 1- How can we calculate the required GSB  quantity?  2 -  What is value of compaction factor for GSB? 3- How much loose thickness of GSB should be taken to get proper compacted layer thickness ?  1- How can we calculate the required GSB quantity? Let us consider Length of GSB bed (L) = 500 Met. Breadth of GSB bed (B) = 7 Met. Thickness of GSB Layer (T)  = 150 mm =0.150 Met. Max. Dry Density (MDD) =2.221 Gram/ Cubic Centimeter = 2221Kg/ Cubic metre Note  -  The value of MDD is calculated by conducting proctor density test as per IS 2720 (part -28) : 1983 (Reaffirmed - May 2015). Then Volume of GSB  Layer = ( Length of GSB Bed X Width of GSB Bed X Thickness of GSB Layer) Volume of GSB  Layer = L X B X T  Volume of GSB  Layer   = 500 X 7 X 0.150  Volume of GSB Layer    = 525 Cubic Metre We Know That Mass = Volume X Density in this case - Mass = Volume X MDD Putting

Dense Bituminous Macadam (DBM) or Bituminous Concrete (BC) layer Quantity / Compaction Factor value / Loose thickness calculation

Dense Bituminous  Macadam (DBM) or   Bituminous Concrete (BC)  quantity / Compaction Factor value for DBM or BC / Loose thickness of DBM or BC Layer  In this article we shall discuss three important points about Dense Bituminous   Macadam (DBM) or Bituminous Concrete (BC) 1- How can we calculate the required DBM/BC quantity?  2 -  What is value of compaction factor for DBM/BC? 3- How much loose thickness should be taken to get proper compacted layer thickness ?  1- How can we calculate the required DBM/BC quantity? Let us consider Length of  DBM/BC layer (L) = 1 Km = 1000 Met. Breadth of DBM/BC Layer (B)= 5 Met. Thickness of DBM/BC Layer (T)  = 50 mm =0.050 Met. Max. Dry Density (MDD) =2.441 Gram/ Cubic Centimeter = 2441KG/ Cubic metre Note  -  The value of MDD is calculated by conducting suitable test . Then Volume of DBM/BC Layer = ( Length of DBM/BC layer X Width of DBM/BC layer  X Thickness of DBM/BC Layer) Volume of DBM/BC Layer = L X B X T Volume o

Wet Mix Macadam (WMM) technical specifications as per MORTH and Indian standard in Civil engineering

WET MIX MACADAM (WMM) sub – base /base:- Wet mix macadam (WMM) act as a base course just below the bituminous layer (bitumen base course or surface course).  The thickness of a single compacted Wet mix macadam(WMM)  layer shall not be less than 75mm.when vibrating or other approved types of compacting equipment are used, the compacted depth of a single layer of the sub-base course may be up to 200mm. How to calculate the loose thickness of WMM, compaction factor and quantity of WMM ? Kindly visit on below link 🔗 WMM- loose thickness,quantity and compaction factor Physical requirements   Material finer than 425 micron shall have plasticity index (PI) not exceeding 6. To determine this combined portion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone sample. Only the elongated particles are separated out from the remaining (non-flaky) stone metal. E

Full form of various terms used in civil engineering /highway engineering or road work

Full Form of various  terms used in civil engineering  (Highway and expressway)  List of various  acronyms or abbreviations used in civil engineering  TBM- Temporary Bench mark (टे᠎म्‌प्‌ररि बेंच मार्क) BM- Bench Mark ( बेंच मार्क ) / Bituminous Macadam ( बिटुमिनस मैकडम) MSL- Mean Sea Level (मीन सी लेवल) BS- Back sight( बैक साइट) FS - Fore sight  (फोर साइट) HI - Height of Instrument ( हाइट आंफ इन्‌स्‍ट्रमन्‍ट्‌) TS-  Total Station (टोटल स्टेशन) GPS- Global Positioning System (ग्लोबल पोजिशनिंग सिस्टम) DGPS - Differential Global Positioning System ( डिफरेंसिअल ग्लोबल पोजिशनिंग सिस्टम) ROW- Right of Way (राइट ऑफ वे) MTV- material Transport vehicle (मटेरियल ट्रांसपोर्ट वहीकल) NGL- Natural Ground Level (नेचुरल ग्राउन्‍ड्‌ लेवल ) OGL- Original Ground level (अˈरिजन्‌ल्‌ ग्राउन्‍ड्‌ लेवल ) C&G- Clearing and Grubbing ( क्लियरिंग और ग्रबिंग) EMB- Embankment SG- Subgrade (सबग्रेड) GSB- Granular sub-base WMM- Wet Mix Macadam ( वेट मिक्स मैकडैम) WBM- Water Bound Ma

DBM (Dense Bituminous Macadam) specificatins,layer thickness, physical requirements, aggregate size, grades and its measurements

 DENSE BITUMINOUS MACADAM(DBM) DBM acts as a bituminous  base course and thickness of a single compacted  layer shall be 50 mm to 100 mm.  In this article we shall discuss about Technical specifications of DBM (Dense Bituminous Macadam), layer thickness, physical requirements, aggregate size, grades and its measurements A-Scope : The work shall consist of construction in a single layer of DBM on a previously prepared base or sub-base. The thickness of a single layer shall be 50 mm to 100 mm. B - Material : The choice of binder material shall be stipulated in the contract or by the engineer, where viscosity grades of bitumen are specified, they are referred to by a designation in accordance with IS: 73. Where modified bitumen is specified, it shall conform to the requirements of IRC:SP:53 and IS:15462. Selection criteria for viscosity grade bitumen based on highest and lowest daily mean temperatures at a particular site are ]given in table no -1. 1-Coarse Agg

Difference between nominal mix and design mix of concrete

Difference between nominal mix and design mix of concrete - Concrete is most extensively used mix to achieve desired properties of structure. There are two methods to prepare the concrete mix. 1-Nominal mix 2- Design mix Nominal mix - Nominal mix specifies the fix proportion of the cement , sand and aggregates. Ingredients of concrete are mixed on the basis of volume. It is a site level mixing of ingredients to prepare concrete mix. Such type of concrete mix is generally used in small quantity or where load is not high. There are many grade of nominal mix concrete like M-5, M-7.5, M-10, M-15 and M-20. In above grades of concrete mix  the letter 'M' refers to Mix where as the value like 5,7.5,10,15 etc indicates the compressive characteristic strength of concrete after 28 days in specified conditios. Unit of this compressive characteristic strength of concrete is  Newton /mm 2. The ratio of various grade of concrete is being given below - M-5 

Bituminous Concrete (BC) specifications viz. Layer thickness, Mix and material requirements, grading , laying trials, Rolling , Construction procedure, transport and joint specifications, surface finish and quality control,measurement and rate etc..as per MORTH and Indian Standard

Bituminous concrete(BC)- Bituminous concrete( BC) is used for wearing  course and profile corrective courses.BC is generally laid in single layer on a previously prepared bituminous bound  surface. The thickness of single layer of BC shall be 30mm,40mm and 50mm. 1 -MATERIAL A- Bitumen - The bitumen shall be viscosity graded paving bitumin complying with IS 73 or specified in contract aggrement. The type and grade of bitumen to be used would depend upon the climatic condition and the traffic. Selection criteria of viscosity graded (VG) paving bitumens based on climatic conditions B- Coarse Aggregate It consist of crushed rock,crushed gravel or other hard material retained on 2.36 mm sieve. It shall be clean ,hard,durable and of cubical shape,free from dust,and  soft organic and other deleterious substances. The aggregates  shall satisfy the physical requirements of table  no. -2 (Table no. 500-16 ,as per MORTH 5th revision) where crushed gravel is proposed 

Civil engineering interview questions in Roadway/Highway /Expressway department

  Welcome friends, We shall learn about the various questions which are frequently ask by an  interviewer In the field of infrastructure.  So let's get start....... EMBANKMENT/SUBGRADE/BORROW AREA •Liquid Limit  <50% •Plastic Limit  < 25% •Proctor Density(Min. Value) For Embankment =1.52 to 1.60 gram/cubic centimeter For Subgrade= 1.75 gram/ cubic centimeter Sub-grade top • Field Dry Density (FDD) For Embankment= min. 95% For Sub grade = min. 97% •Number of test For Embankment = 1set/3000 sq.meter(1set=10pits) For subgrade= 1set/2000 sq.meter (1 set=10 pits) GRANULAR SUB- BASE •Maximum thickness of single compacted layer = 200 mm • Minimum thickness of single compacted layer( only when GSB is laying in two layers) = 150 mm •Max. Allowable size of aggregate =75mm •Number of grading of GSB = 6 •Liquid limit  should not be  more than 25% ( test procedure as per IS 2720 (part 5)). •Plasticity index should  not be more than 6%